Sezon 1
2020
4 Bölüm
Bölümler
Bölüm açıklamaları:

1. Bölüm
Action Stations
12 Ağustos 202051 dk🇬🇧 EN
The show kicks off with a dynamic taster of what the series has in store - namely the inside story of a crack team building a trailblazing, fully-automated metro system costing $50 billion.

2. Bölüm
What Lies Beneath
19 Ağustos 202051 dk🇬🇧 EN
We check in on our engineers encountering all manner of issues tunnelling through a minefield of existing infrastructure - skyscraper footings and basements, sewers, a graveyard, and rail tunnels.

3. Bölüm
Digging Deep
2 Eylül 202050 dk🇬🇧 EN
Another super challenge looms, perhaps the greatest of the entire project - digging two tunnels beneath Sydney Harbour.

4. Bölüm
Fast Tracked
9 Eylül 202050 dk🇬🇧 EN
We follow architect Ross de la Motte, seeing that his vision for the stations has finally come to light. He has gone to great lengths to design stations that benefit from natural light and airflow.