Sezon 2

1991
23 Bölüm

Bölümler

Bölüm açıklamaları:
1. Bölüm

Split-level Ranch: Selecting the House

2 Eylül 1991🇬🇧 EN

A new project is introduced: the renovation of a 17-year-old ranch-style house in Plymouth, Mass. Included: a look at other homes in Plymouth.

2. Bölüm

Split-level Ranch: Demolition and Remodeling

9 Eylül 1991🇬🇧 EN

The deck and front entryway are demolished. Also: a look at an architect's computer-generated plans for the house.

3. Bölüm

Split-level Ranch: Framing and Demolition

16 Eylül 1991🇬🇧 EN

Construction begins on the front entryway; the old bathroom fixtures are removed.

4. Bölüm

Split-level Ranch: Septic System, Bathroom Fixtures and Windows

23 Eylül 1991🇬🇧 EN

Work begins on the new bathroom; a window and roof trim are added to the entryway. Also: landscaping plans.

5. Bölüm

Split-level Ranch: Paint Prep, Attic Louver and French Doors

30 Eylül 1991🇬🇧 EN

A broken storm window is replaced; tile work is started in the bathroom; a bathroom vanity is installed. Also: a tour of a tile factory in Florida.

6. Bölüm

Split-level Ranch: Bay Window and Cabinet Doors

7 Ekim 1991🇬🇧 EN

Installed: a bay window in the dining room; cabinet doors in the kitchen. Also: a tour of a country-style kitchen in Nantucket, Massachusetts.

7. Bölüm

Split-level Ranch: Counters, Deck and Vinyl Floor

🇬🇧 EN

Installed a laminated kitchen countertop, and a vinyl floor. Also, the exterior is painted and a backyard deck is started.

8. Bölüm

Split-level Ranch: Fireplace and Deck

21 Ekim 1991🇬🇧 EN

Colonial-style molding and a mantelpiece are installed in the living room; the backyard deck is completed. Also: a visit to the home of John Adams (1735-1826) in Quincy, Massachusetts.

9. Bölüm

Split-level Ranch: Masonry and Floor

28 Ekim 1991🇬🇧 EN

A masonry barbecue is repaired; the basement remodeling begins.

10. Bölüm

Split-level Ranch: Installing Wallpaper, Door and Paneling

4 Kasım 1991🇬🇧 EN

A decorator offers suggestions on choosing wallpaper; a paperhanger demonstrates his craft in the living room. Also: a floor is installed in the family room; a front door is crafted.

11. Bölüm

Split-level Ranch: Light Fixture Wiring and Trellis

11 Kasım 1991🇬🇧 EN

Wiring is installed for a Colonial-style light fixture and a the refrigerator's icemaker is hooked up. Also: a trellis is constructed in the front yard.

12. Bölüm

Split-level Ranch: Plate Rack Construction

18 Kasım 1991🇬🇧 EN

Bob constructs a plate rack for the dining room and shops for carpet for the living room. Outside, shrubs are transplanted, perennials are planted and the lawn is sodded.

13. Bölüm

Split-level Ranch: House Tour

25 Kasım 1991🇬🇧 EN

The finished house is toured, including the basement rec room, and the designer discusses the Colonial decor. Also: a look at the outside elements such as landscaping, gutters and a trellis.

14. Bölüm

Cracker Cottage: Selecting and Touring the House

2 Aralık 1991🇬🇧 EN

Bob goes hunting for a house to remodel in Naples, Florida. He tours the 'Cracker' cottage he plans to renovate, then looks at similar, recently revamped cottage for inspiration.

15. Bölüm

Cracker Cottage: Outdoor Work and Planning

9 Aralık 1991🇬🇧 EN

A landscaper transplants a frangipani tree. Also: termite damage is checked.

16. Bölüm

Cracker Cottage: Demolition and Roof Brackets

16 Aralık 1991🇬🇧 EN

The architect presents her plans; the contractor explains the demolition process.

17. Bölüm

Cracker Cottage: Installing a Door and Removing Paint

23 Aralık 1991🇬🇧 EN

Included: a visit to a salvage yard in search of doors and lavatories. Demonstrated: how to wash peeling paint from exterior siding.

18. Bölüm

Cracker Cottage: Paint Prep, Attic Louver and French Doors

30 Aralık 1991🇬🇧 EN

Demonstrated: smoothing out exterior siding using spackle; replacing an attic louver; and installing French doors in the entryway.

19. Bölüm

Cracker Cottage: Swimming Pool and Drywall Ceiling

27 Ocak 1992🇬🇧 EN

Included: the pool is tiled; drywall is installed in the living room; the carport is made into a garden area. Also: a visit to the development project in New York.

20. Bölüm

Cracker Cottage: Cabinets, Ceiling Fan and Porch Screen

3 Şubat 1992🇬🇧 EN

Installed: kitchen cabinets; screening and a ceiling fan on the porch. Also: an update on the New York tenement project.

21. Bölüm

Cracker Cottage: Installing Windows and Shower

6 Şubat 1992🇬🇧 EN

Included: replacing porch windows and constructing a tongue-and-groove deck. Also: a shower-drain installation begins.

25. Bölüm

Cracker Cottage: Constructing the Swimming Pool and Shower Stall

20 Şubat 1992🇬🇧 EN

The pool walls are formed and reinforced and wainscoting is installed in the bathroom. Also: a visit to a development project in New York.

26. Bölüm

Cracker Cottage: House Tour

24 Şubat 1992🇬🇧 EN

A look at the landscaped areas and the slat house. Also: refinishing used furniture.