Sezon 13

19 Bölüm

Bölümler

Bölüm açıklamaları:
3. Bölüm

Modern Colonial: Shingles and Windows

16 Eylül 2002🇬🇧 EN

On the roof, asphalt shingles are installed; back on the ground, windows are put in. Included: home designs of the firm of noted 20th-century architect Royal Barry Wills.

4. Bölüm

Modern Colonial: Radiant Heating System and Ductwork

24 Mart 2002🇬🇧 EN

Bob Vila surveys the HVAC ductwork and the crew installs a new radiant heating system. Also: a tour of a the Julia Wood House in Falmouth, Massachusetts.

5. Bölüm

Modern Colonial: Gas Fireplaces and Cedar Shingles

30 Eylül 2002🇬🇧 EN

Cedar shingles are applied to the roof and a gas fireplace unit is installed on the ground floor. Also: a trip to Canada to see how wood shingles are milled.

8. Bölüm

Modern Colonial: Garage Door and Generator Installation

21 Ekim 2002🇬🇧 EN

A generator system is installed, while new carriage-style doors make their way onto the garage. Also: a tour of the Jackson homestead in Newton, MA.

9. Bölüm

Modern Colonial: Wood Floor Installation

28 Ekim 2002🇬🇧 EN

Bob takes a look at some hardscape work being done, specifically a new cobblestone driveway apron, but the real story is flooring.

11. Bölüm

Modern Colonial: Interior Door Installation and Plan Modifications

11 Kasım 2002🇬🇧 EN

Work continues in the master suite. Master carpenter Bob Ryley installs a new door and applies interior trim.

12. Bölüm

Modern Colonial: Interior Woodwork

18 Kasım 2002🇬🇧 EN

Crown moldings are added in the dining room. Bob Vila visits the North Bennet Street School to learn about its preservation carpentry program.

13. Bölüm

Modern Colonial: Exterior Landscaping

25 Kasım 200230 dk🇬🇧 EN

Bob Vila turns his attention to exterior work on the house, starting with a tour of Mahoney's Nursery led by landscape designer Ruth Foster.

14. Bölüm

Modern Colonial: Mechanical Systems and Basement Refinishing

2 Aralık 2002🇬🇧 EN

Mechanical systems are being installed throughout the house.

15. Bölüm

Modern Colonial: Mechanical Systems and Interior Finishing

9 Aralık 2002🇬🇧 EN

Bob Vila tours the finished landscape at the project house before visiting the historic gardens at Glen Magna farm in Danvers, MA.

16. Bölüm

Modern Colonial: Kitchen Cabinetry and Countertops

16 Aralık 2002🇬🇧 EN

Bob Vila focuses on the work being done in the kitchen of the modern, colonial-style home.

17. Bölüm

Modern Colonial: Bedroom Amenities

23 Aralık 2002🇬🇧 EN

The crew works to install the perimeter fence, while inside a custom closet system is added.

18. Bölüm

Modern Colonial: Interior Decorating Tour

30 Aralık 2002🇬🇧 EN

Windows are installed, paint prep is performed, and decorating is done in the bedroom. Also: a tour of the Lyman Estate.

19. Bölüm

Modern Colonial: Workshops and Woodworking

5 Ocak 2003🇬🇧 EN

A planter box is constructed for the sunroom. Also, Bob Vila tours Winterthur, a historic estate in Delaware, and The North Bennet Street School, an arts instruction institution in Boston.

20. Bölüm

Modern Colonial: Classic Interiors and Cabinet Install

12 Ocak 2003🇬🇧 EN

Shelving and cabinet installation are underway. Bob Vila tours Winterthur and The North Bennet Street School.

21. Bölüm

Modern Colonial: Wood Floor Finishing

19 Ocak 2003🇬🇧 EN

Techniques for achieving a smooth, even finish with hardwood flooring are demonstrated. Also: a tour of the Hancock Land Company's sustainable forestry operation in Casco, ME.

22. Bölüm

Modern Colonial: Interior Craftwork

26 Ocak 2003🇬🇧 EN

Bob Vila focuses on the decorative interior finish work. Also: touring a selection of famous parlors featuring American decorative arts.

24. Bölüm

Modern Colonial: More Interior Design Projects

10 Şubat 2003🇬🇧 EN

Interior design work continues. Also: Bob Vila takes another trip to Winterthur, this time to tour the Chinese Parlor.

25. Bölüm

Modern Colonial: Appliance Installation and Furniture Making

17 Şubat 2003🇬🇧 EN

The washer and dryer and shower hardware go in and a medicine cabinet is installed. Bob Vila returns to the North Bennet School.