Sezon 10

1999
26 Bölüm

Bölümler

Bölüm açıklamaları:
1. Bölüm

Habitat for Humanity: Habitat for Humanity Project Begins

6 Eylül 1999🇬🇧 EN

Plans are under way to build a house in one week with a team of Habitat for Humanity volunteers in Yonkers, NY. Included: a tour of Yonkers and of a Habitat community in Phoenix.

2. Bölüm

Habitat for Humanity: Framing the Walls

13 Eylül 1999🇬🇧 EN

The walls go up at the Roxbury project, and Bob Vila tours a manufacturing facility where special structural insulated panels (SIPs) are made. Also: a look at a money-saving system for recapturing heat from drain water.

3. Bölüm

Habitat for Humanity: Working On the Roof

20 Eylül 1999🇬🇧 EN

Roof framing begins and the giant ridge beam is raised. Also: a tour of the Oregon plant where I-joists are made.

4. Bölüm

Habitat for Humanity: Exterior Trim and Porch Ceiling

27 Eylül 1999🇬🇧 EN

Exterior trim work continues, while overlaid plywood is installed on the porch ceiling by a team of volunteers and celebrities. Included: tour of a plywood mill in Washington.

5. Bölüm

Habitat for Humanity: Sheathing and Shingling the Roof

4 Ekim 1999🇬🇧 EN

Roofing work continues with the installation of photovoltaic shingles that convert solar energy into electricity. Also: a tour of the Global Solar Plant in Arizona.

6. Bölüm

Habitat for Humanity: Siding and Drywall

11 Ekim 1999🇬🇧 EN

A special siding goes up, and drywall with pre-finished corners is installed in record time.

7. Bölüm

Habitat for Humanity: Building the Back Porch

18 Ekim 1999🇬🇧 EN

The back porch is built with help from some high school tech students, and the trim gets finishing touches.

8. Bölüm

Habitat for Humanity: Painting and Door Installation

25 Ekim 1999🇬🇧 EN

Bob Vila explains door installation, while indoor and outdoor painting gets underway at the project house.

9. Bölüm

Habitat for Humanity: Floor Installation

1 Kasım 1999🇬🇧 EN

An entertainment center, flooring, and loft shelves are installed.

10. Bölüm

Habitat for Humanity: Working On the Kitchen

8 Kasım 1999🇬🇧 EN

Cabinets and counter tops are installed in the kitchen, and money saving energy efficient appliances are discussed.

11. Bölüm

Habitat for Humanity: Carpet and Bathroom Fixtures

15 Kasım 1999🇬🇧 EN

Carpet is laid in a bedroom and high efficiency fixtures are installed in the bathroom.

12. Bölüm

Habitat for Humanity: Interior Design

22 Kasım 1999🇬🇧 EN

Guest B. Smith applies a colorful wainscot pattern along the wall of the children's bedroom.

13. Bölüm

Habitat for Humanity: House Tour

🇬🇧 EN

Açıklama yok

14. Bölüm

Executive Mansion: Governor's Mansion Tour

6 Aralık 1999🇬🇧 EN

Bob Vila and crew take on restoring the Virginia governor's Federal style mansion, built in 1813.

15. Bölüm

Executive Mansion: Restoring the Floor

13 Aralık 1999🇬🇧 EN

Floor restoration is underway with an acrylic injection technique.

16. Bölüm

Executive Mansion: Preparing to Pour a Concrete Floor

20 Aralık 1999🇬🇧 EN

Preparations are made to pour a concrete floor in the basement, utilizing an elaborate concrete pump system.

17. Bölüm

Executive Mansion: Removing Windows for Restoration

27 Aralık 1999🇬🇧 EN

Paint is removed from the masonry garden walls and windows are taken down for restoration.

18. Bölüm

Executive Mansion: Framing New Walls

3 Ocak 2000🇬🇧 EN

Framing and trim work are underway in the basement, which is being transformed to include a state-of-the-art kitchen, wine cellar, and laundry.

19. Bölüm

Executive Mansion: Installing a Dumbwaiter

10 Ocak 2000🇬🇧 EN

A dumbwaiter is installed to connect the basement kitchen with the first-floor dining room.

20. Bölüm

Executive Mansion: Installing Baseboards

17 Ocak 2000🇬🇧 EN

Baseboard is installed on the second floor to accommodate updated HVAC and electrical systems.

21. Bölüm

Executive Mansion: Basement Kitchen

24 Ocak 2000🇬🇧 EN

Preparations are made in the basement kitchen for state-of-the-art foodservice equipment and appliances.

22. Bölüm

Executive Mansion: Mantelpiece Restoration

31 Ocak 2000🇬🇧 EN

The mantelpieces are preserved in order to restore historic features to the mansion.

23. Bölüm

Executive Mansion: Technology Systems Tested

7 Şubat 2000🇬🇧 EN

Landscaping, masonry work, and painting are done on the mansion's exterior.

24. Bölüm

Executive Mansion: Finishing the Kitchen

14 Şubat 2000🇬🇧 EN

A small kitchen in the governor's private quarters is finished and carpet is put down in the bedrooms.

25. Bölüm

Executive Mansion: Interior Decorating

21 Şubat 2000🇬🇧 EN

The mansion gets elaborate interior decor.

26. Bölüm

Executive Mansion: Mansion Final Tour

🇬🇧 EN

Açıklama yok