Sezon 1

1990
34 Bölüm

Bölümler

Bölüm açıklamaları:
1. Bölüm

Cape-style Home: Clearing the Lot

3 Eylül 1990🇬🇧 EN

Construction begins on a Cape Cod-style home being built in Marstons Mills, Massachusetts. Included: the lot is cleared and cement is poured for the foundation of the house.

2. Bölüm

Cape-style Home: Ell and Deck

10 Eylül 1990🇬🇧 EN

A recycled "ell" is added,and a first-floor deck is built. Also: tips on ordering lumber.

3. Bölüm

Cape-style Home: Wall Construction

17 Eylül 1990🇬🇧 EN

Bob visits Barbara Gooddale in her authentic antique Cape Cod house to get a feel for the style and practicality of this design; back at our house, the crew frames, raises, and springbraces the walls.

4. Bölüm

Cape-style Home: Staircase and Roof

24 Eylül 1990🇬🇧 EN

A staircase is built and the second floor is toured. Also: Bob Vila visits a shingle plant in Delaware.

5. Bölüm

Cape-style Home: Ceiling, Roof and Plumbing

1 Ekim 1990🇬🇧 EN

Some demolition is done on the old ell to prepare it for renovation; ceiling joists and roof rafters go up in the new section of the house, and we see some rough plumbing work. Bob and Ryley discuss the budget.

6. Bölüm

Cape-style Home: Bulkhead, Trim and Roofing

8 Ekim 1990🇬🇧 EN

A bulkhead is installed; a soffet, facia and drip edge are added to the front of the house. Also: asphalt shingles and a ridge vent.

7. Bölüm

Cape-style Home: Joining the Old Ell

15 Ekim 1990🇬🇧 EN

The old ell is joined to the new construction, with some demolition done to make room for a shed dormer and a slider door. Bob visits the Wes-Pine wooden window factory in Hanover, Massachusetts, and comes back to install a window in our house.

8. Bölüm

Cape-style Home: Front Door, Shingles and Plumbing

22 Ekim 1990🇬🇧 EN

Bob and Ryley install the pre-hung front door and visit Shepley Wood Products to see how it was made. Dean Fraser shows us how to apply cedar shingles, and Tom Higham demonstrates how to join copper plumbing for the bathroom lavatory.

9. Bölüm

Cape-style Home: Wiring, Clapboards and Window Trim

29 Ekim 1990🇬🇧 EN

Bob goes over the electrical wiring with John Hickey, cedar clapboards are put up, and Hand Cassidy explains insulation ratings. Our contractor Ryley puts exterior trim up around the windows.

10. Bölüm

Cape-style Home: Kitchen Design and Septic System

5 Kasım 1990🇬🇧 EN

Bob discusses the kitchen layout with designer Amy O'Haire, then visits her showroom. Claude Daigle demonstrates his drywall techniques, and John Aalto talks us through the installation of the septic system.

11. Bölüm

Cape-style Home: Paneling, Furnace and Tile

13 Kasım 1990🇬🇧 EN

Our contractor Ryley shows us how to put up the pine interior paneling in the living room; Bob checks out the furnace and ducting with installer Scott Glista, and watches John Boardman apply bathroom floor tile.

12. Bölüm

Cape-style Home: Floor Painting and Bathroom Vanity

19 Kasım 1990🇬🇧 EN

Artisan Terry Maiche shows us two inexpensive ways to dress up a floor with paint: spattering and stenciling. Ryley builds a bathroom vanity, and Bob talks about exterior paints and stains with painter Paul Stoliker.

13. Bölüm

Cape-style Home: Landscaping and House Tour

26 Kasım 1990🇬🇧 EN

Bob discusses landscaping with specialist Susan Hofer--sod, a gravel driveway, brickwork, fences, perennials. We tour the smart finished exterior with Ryley, and the gorgeous interior with renowned decorator Ann Hill.

14. Bölüm

Two-family Greystone: House and Neighborhood Tour

3 Aralık 1990🇬🇧 EN

Now in Chicago, Bob takes a driving tour with realtor Catherine Caravette of our new neighborhood, Wicker Park, and of nearby upscale Lincoln Park. We check out our old greystone two-flat and visit a home that's been comparably renovated.

15. Bölüm

Two-family Greystone: Plans Discussed and Demolition Begins

10 Aralık 1990🇬🇧 EN

Bob discusses plans with local architect Bill Bauhs, and takes a tour of downtown Chicago's striking modern buildings with architectural historian Susan Benjamin. Back at our house, we meet our general contractor, Ron Gan, and begin demolition.

16. Bölüm

Two-family Greystone: Engineered Beams and Plumbing

17 Aralık 1990🇬🇧 EN

Bob and Ron discuss the removal and shoring up of bearing walls, to be replaced by special engineered beams. We visit Macmillan-Bloedel's Parallam Plant in British Columbia, and plumber Don McPoland shows us how water service is connected to the house.

17. Bölüm

Two-family Greystone: Parallam and Iron Beam

24 Aralık 1990🇬🇧 EN

The crew installs a Parallam beam in the living room and iron beams in the back masonry wall. Ron Gan and Bill Bauhs talk budget and convince Bob to renovate the basement as well, so we take a visit to the Pella Window factory in Pella, Iowa.

18. Bölüm

Two-family Greystone: Basement Excavation Begins

31 Aralık 1990🇬🇧 EN

Scott Smith's excavation crew digs out the basement to make room for a basement slab. Bob discusses heating systems for the rental units with installer Kirk Rustman, and Ron Gan explains the advantages of using metal wall studs in the kitchen.

19. Bölüm

Two-family Greystone: Electrical Work Begins

7 Ocak 1991🇬🇧 EN

The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.

20. Bölüm

Two-family Greystone: Plumbing Continues

14 Ocak 1991🇬🇧 EN

Bob goes downtown to the Merchandise Mart to see a selection of bathroom fixtures. Back at our greystone, plumber Dan Macias replaces an old toilet and our contractor talks us through bricking in for, and installation of, a smaller bathroom window.

21. Bölüm

Two-family Greystone: Plaster and Drywall Work

21 Ocak 1991🇬🇧 EN

Drywall and plaster work is discussed. Also: a visit to a drywall plant in Delaware.

22. Bölüm

Two-family Greystone: Budgeting and Tiling

28 Ocak 1991🇬🇧 EN

A review of the project's budget and progress. Also: a trip to an appliance showroom, and the bathroom floor is prepped and tiled.

23. Bölüm

Two-family Greystone: Lighting and Flooring

3 Şubat 1991🇬🇧 EN

Wooden floors are refinished and new windows are installed. Also: a visit to a light-fixtures store.

24. Bölüm

Two-family Greystone: Landscaping Begins

10 Şubat 1991🇬🇧 EN

Kitchen cabinets are installed and the landscaping work begins.

25. Bölüm

Two-family Greystone: Flooring and Stairs

17 Şubat 1991🇬🇧 EN

Installed: a basement staircase. Also: a visit to a flooring plant.

26. Bölüm

Two-family Greystone: House Tour

24 Şubat 1991🇬🇧 EN

Kitchen countertops are mounted. Also: a tour of the home with an interior decorator.

27. Bölüm

Coach House: Coach House Tour

4 Mart 1991🇬🇧 EN

Bob and contractor Ron Gan look around our next projectan old deserted "coach house." Architectural historian Susan Benjamin gives us a tour of some of Chicago's 19th-century landmark buildings downtown.

28. Bölüm

Coach House: Plans Discussed and Demolition Begins

11 Mart 1991🇬🇧 EN

Bob discusses plans for the coach house with our architect, Mike Morgan, and with contractor Ron Gan; demolition begins. Brick worker Dan Webb explains how the brick facade is power-washed to remove several layers of ugly paint.

29. Bölüm

Coach House: Excavation Begins

18 Mart 1991🇬🇧 EN

Bob tours architect Frank Lloyd Wright's studio and sees some houses Wright designed in Greater Chicago. Back at the coach house, the basement is excavated and steel beams are put into the back wall to make room for a garage door.

31. Bölüm

Coach House: Roof Demolition

1 Nisan 1991🇬🇧 EN

The Eagle roofing crew strips several ancient layers of old roofing, and a section of the roof is removed to make room for a new dormer. Bob explains how the dormer will provide more living space, and visits the IKO roofing shingle plant.

33. Bölüm

Coach House: Fireplace and Staircase

15 Nisan 1991🇬🇧 EN

Bob tours the Hill Arboretum, an apartment project adapted for the physically challenged. Back at the coach house, a fireplace dealer explains the new zero-clearance fireplace and an ironmonger constructs an entryway balcony and staircase.

37. Bölüm

Coach House: Project Status, Cabinets and Whirlpool Tub Installed

13 Mayıs 1991🇬🇧 EN

Bob tours the completed living room and dining room of the coach house, then reviews work done on the heating system. We see the base cabinets installed in the kitchen and a whirlpool tub installed in the master bedroom.

38. Bölüm

Coach House: Finishing Touches and Landscaping

20 Mayıs 1991🇬🇧 EN

Bob installs the finishing touches in the coach house kitchen, including some galvanized steel features. We go outside to plant a tree and landscape the little entryway garden, and Bob checks out the painting of the brick facade.

39. Bölüm

Coach House: House Tour

27 Mayıs 1991🇬🇧 EN

Bob takes the grand tour of the finished coach house exterior with Ron, our contractor. We go inside to see the decorating job that the team of Rita Miller and Bill Waggoner have done, and to watch them add a special touch to the decor.